Do you want to improve your writing? Try our new evaluation service and get detailed feedback.
Check Your Text it's free

Is it better to work on a project in a group or to work by yourself? Give reasons or examples from your life, events, etc. v.2

Is it better to work on a project in a group or to work by yourself? Give reasons or examples from your life, events, etc. v. 2
Doing project well depends on many parameters and as a project is larger it will be more complicated. Beside the proficiency required for this mission, it needs communication, corporation and management abilities. These specifications are viable at team working with more ease and higher success. Working in group causes many advantages in doing project such as accurate and fast working, science circulation and having varieties ideas. First, persons working on project as members in group can cover each other. Thus the probable mistakes are prevented. For example I cooperated with one of my friends in university on a lesson project. Due to we should have reached to the same result with different ways, we checked our answer at each step. Sometimes we faced to incongruous outputs then we returned to check process. Clearly number of mistakes and speed of project will be improved in team working. Second, generally in social activity people can learn many things from each other rather than individual working. For instance, we made group of five to analyze a metallic beam in our university. Usually everyone knew especial software or knowledge so there was great chance for group' s members to share their skills and mostly students appreciated this opportunity. Consequently after a team working, knowledge of each person is circulated and leads to gain more skills. Moreover, in group of five commonly we encounter five times greater number of ideas rather in group of one and the presented ideas can be combined with each other and new ones are innovated. For example many of successful companies are started in team working such as Mercedes Benz which its owners could conquer over problems mutually. In the end, the project in group can be done with diverse ideas and members can cope with problems better. All in all, working in group has many undeniable beneficial advantages and finally group can arrange its own time reasonably during working on project.
Doing
project
well depends on
many
parameters and as a
project
is larger it will be more complicated. Beside the proficiency required for this mission, it needs communication, corporation and management abilities. These specifications are viable at
team
working
with more
ease
and higher success.
Working
in
group
causes
many
advantages in doing
project
such as accurate and
fast
working
, science circulation and having varieties
ideas
.

First
, persons
working
on
project
as members in
group
can cover each other.
Thus
the probable mistakes are
prevented
. For
example I
cooperated with one of my friends in university on a lesson
project
. Due to we should have reached to the same result with
different
ways, we
checked
our answer at each step.
Sometimes
we faced to incongruous outputs then we returned to
check
process.
Clearly
number of mistakes and speed of
project
will be
improved
in
team
working.

Second,
generally
in social activity
people
can learn
many
things from each other
rather
than individual
working
.
For instance
, we made
group
of five to analyze a metallic beam in our university.
Usually
everyone knew especial software or knowledge
so
there was great chance for
group&
#039; s members to share their
skills
and
mostly
students appreciated this opportunity.
Consequently
after a
team
working
, knowledge of each person
is circulated
and leads to gain more
skills
.

Moreover
, in
group
of five
commonly
we encounter five times greater number of
ideas
rather
in
group
of one and the presented
ideas
can
be combined
with each other and new ones
are innovated
.
For example
many
of successful
companies
are
started
in
team
working
such as
Mercedes Benz
which its owners could conquer over problems
mutually
. In the
end
, the
project
in
group
can
be done
with diverse
ideas
and members can cope with problems better.

All in all,
working
in
group
has
many
undeniable beneficial advantages and
finally
group
can arrange its
own
time
reasonably
during
working
on
project
.
13Linking words, meeting the goal of 7 or more
30Repeated words, meeting the goal of 3 or fewer
5Mistakes

IELTS essay Is it better to work on a project in a group or to work by yourself? Give reasons or examples from your life, events, etc. v. 2

Essay
  American English
5 paragraphs
322 words
5.5
Overall Band Score
Coherence and Cohesion: 5.5
  • Structure your answers in logical paragraphs
  • ?
    One main idea per paragraph
  • Include an introduction and conclusion
  • Support main points with an explanation and then an example
  • Use cohesive linking words accurately and appropriately
  • Vary your linking phrases using synonyms
Lexical Resource: 5.5
  • Try to vary your vocabulary using accurate synonyms
  • Use less common question specific words that accurately convey meaning
  • Check your work for spelling and word formation mistakes
Grammatical Range: 5.5
  • Use a variety of complex and simple sentences
  • Check your writing for errors
Task Achievement: 6.0
  • Answer all parts of the question
  • ?
    Present relevant ideas
  • Fully explain these ideas
  • Support ideas with relevant, specific examples
Labels Descriptions
  • ?
    Currently is not available
  • Meet the criteria
  • Doesn't meet the criteria
Similar posts