this flow chart clearly divides the process of getting driving lecense in uS into three main parts and describes the features of each part v.1
this flow chart clearly divides the process of getting driving lecense in uS into three main parts and describes the features of each part v. 1
The diagram compares two different methods of defences for homes which are at risk of being flooded.
OVerall, the key difference between the diagrams is that they show flood protection with and without a stopbank. Moreover, the at-risk home is raised on stilts above ground level.
The first diagram shows how a stopbank acts as a flood barrier to stop river water from flooding homes. The stp[bank is a small mound of land which is higher than the 100-year flood level, and halt the river from bursting its banks. Nearby houses can be built on stilts to prevent flooding from rainwater, and a floodgate beneath the stopbank can be opened all the water from internal ponding out when it is full.
When there is no stopbank, as shown in the second diagram, the will be nothing to stop the river from flooding. In this case, the solution is to put buildings on stilts, The height of the stilts is measured so that the floor of the house is 300mm above the 100-year flood level
The diagram compares two
different
methods of
defences
for homes which are at
risk
of
being flooded
.
OVerall
, the key difference between the diagrams is that they
show
flood
protection with and without a
stopbank
.
Moreover
, the at-
risk
home
is raised
on
stilts
above ground level.
The
first
diagram
shows
how a
stopbank
acts as a
flood
barrier to
stop
river water from flooding homes. The
stp
[
bank is a
small
mound of land which is higher than the 100-year
flood
level, and halt the river from bursting its banks. Nearby
houses
can
be built
on
stilts
to
prevent
flooding from rainwater, and a floodgate beneath the
stopbank
can
be opened
all the water from internal
ponding
out when it is full.
When there is no
stopbank
, as shown in the second diagram,
the
will be nothing to
stop
the river from flooding.
In this case
, the solution is to put buildings on
stilts
, The height of the
stilts
is measured
so
that the floor of the
house
is
300mm
above the 100-year
flood
level
3Linking words, meeting the goal of 7 or more
8Repeated words, meeting the goal of 3 or fewer
12Mistakes