Do you want to improve your writing? Try our new evaluation service and get detailed feedback.
Check Your Text it's free

The diagrams show the cross-sections of two tunnels, one joining France and Italy and the other joining two Japanese islands v.1

The diagrams show the cross-sections of two tunnels, one joining France and Italy and the other joining two Japanese islands v. 1
The diagrams compare the differences of the cross-sections of two tunnels. Figure 1 shows the cross-section of a road tunnel joining two European countries; while figure 2 illustrates a railway tunnel linking two islands in Japan. Overall, as can be seen from the diagrams, the Seikan Railway Tunnel took such a longer construction time compared to the Mont-Blanc Road Tunnel. Also, the Japanese railway tunnel is significantly longer than the road one. The Seikan Railway Tunnel was built under the sea to link the two Japanese cities in two islands namely Hakodate City and Aomori City. It took 42 years to completely finished, from 1946 to 1988, 34 years longer compared to the road tunnel built under Mont-Blanc to join French and Italy, which was built between 1956 and 1965. The depth of the Mont-Blanc Road Tunnel is 3, 5 km; whereas that of the Seikan Railway Tunnel is just 24m. However, the latter has a length of 53, 85 km compared to 11, 60 km of the former.
The diagrams compare the differences of the cross-sections of two
tunnels
. Figure 1
shows
the cross-section of a
road
tunnel
joining two European countries; while figure 2 illustrates a
railway
tunnel
linking two islands in Japan.

Overall
, as can be
seen
from the diagrams, the
Seikan
Railway
Tunnel
took such a longer construction time compared to the Mont-Blanc
Road
Tunnel
.
Also
, the Japanese
railway
tunnel
is
significantly
longer than the
road
one.

The
Seikan
Railway
Tunnel
was built
under the sea to link the two Japanese cities in two islands
namely
Hakodate
City and
Aomori
City. It took 42 years to completely finished, from 1946 to 1988, 34 years longer compared to the
road
tunnel
built under Mont-Blanc to
join
French and Italy, which
was built
between 1956 and 1965.

The depth of the Mont-Blanc
Road
Tunnel
is 3, 5 km; whereas that of the
Seikan
Railway
Tunnel
is
just
24m
.
However
, the latter has a length of 53, 85 km compared to 11, 60 km of the former.
4Linking words, meeting the goal of 7 or more
20Repeated words, meeting the goal of 3 or fewer
6Mistakes

IELTS academic The diagrams show the cross-sections of two tunnels, one joining France and Italy and the other joining two Japanese islands v. 1

Academic
  American English
4 paragraphs
169 words
6.0
Overall Band Score
Coherence and Cohesion: 7.0
  • Structure your answers in logical paragraphs
  • ?
    One main idea per paragraph
  • ?
    Include an introduction and conclusion
  • ?
    Support main points with an explanation and then an example
  • Use cohesive linking words accurately and appropriately
  • ?
    Vary your linking phrases using synonyms
Lexical Resource: 5.0
  • Try to vary your vocabulary using accurate synonyms
  • Use less common question specific words that accurately convey meaning
  • Check your work for spelling and word formation mistakes
Grammatical Range: 6.5
  • Use a variety of complex and simple sentences
  • Check your writing for errors
Task Achievement: 5.0
  • Answer all parts of the question
  • ?
    Present relevant ideas
  • Fully explain these ideas
  • ?
    Support ideas with relevant, specific examples
Labels Descriptions
  • ?
    Currently is not available
  • Meet the criteria
  • Doesn't meet the criteria
Similar posts