The bar graph enumerates the statistics of expenditure of five different companies for machinery, building, staff training and research. At the first glance, it can be observed that the distribution of investment are varied in the organizations.
In terms of machinery, C had the greatest number of invested money, about 1. 3 billion euros, while the figure in organization A were roughly lower, standing at 1 billion. The contribution for machinery of E ranked the last as it spent 0. 8 billion euros. Also, B and D had similar investing number in machinery, just under 1 billion euros.
Moreover, A and B shared a similar investing trend that both consumed more than 1 billion euros for building, staff trainind and research. It is also noticeable about firm C since it was the only one spent the most for research and machinery (above 1200 million for these two fields). In contrast, E had tendency to pay more for coaching staff and constructing, 0. 9 for instruction and 1 for construction (billion euros).
In conclusion, D and E can be seen as two companies having the lowest range od budget.
The bar graph enumerates the statistics of expenditure of five
different
companies
for
machinery
, building, staff training and research. At the
first
glance, it can
be observed
that the distribution of investment
are varied
in the organizations.
In terms of
machinery
, C had the greatest number of invested money, about 1. 3
billion
euros, while the figure in organization A were roughly lower, standing at 1
billion
. The contribution for
machinery
of E ranked the last as it spent 0. 8
billion
euros.
Also
, B and D had similar investing number in
machinery
,
just
under 1
billion
euros.
Moreover
, A and B shared a similar investing trend that both consumed more than 1
billion
euros for building, staff
trainind
and research. It is
also
noticeable about firm C since it was the
only
one spent the most for research and
machinery
(above 1200 million for these two fields).
In contrast
, E had tendency to pay more for coaching staff and constructing, 0. 9 for instruction and 1 for construction
(billion
euros).
In conclusion
, D and E can be
seen
as two
companies
having the lowest range
od
budget.