The plans demonstrate the map of the airport at present and how it will be altered in the next year.
As can be seen from the plans, the airport will expand and add plenty of services to serve for the passengers.
Apparently, the depatures and the arrivals area will remain unchaged. It has a small change that add one more checking door for each area. The space for security, passport control and customs will not have any adjustments. The shop will be destructed. The check-in point and the coffee shop in the departures area will be projected to change to the opposite side. The bag drop will be added. In the arrivals area, there will be a massive modification. There are three buildings are in the changing plan to be construct. The ATM and another coffee shop serve the customer's need, and the car hire is going to be subjoin in an expanded area.
The most noticeable change is the gates. Now, there are 8 gates with the walkway to connect them, but after 1-year period, it is projected to become 18 gates, which means 10 gates will be added and the way to connect them will also alter, they use sky train instead of walkway. 
The plans demonstrate the map of the airport at present and how it will  
be altered
 in the  
next
 year.
As can be  
seen
 from the plans, the airport will expand and  
add
  plenty
 of services to serve for the passengers. 
Apparently
, the  
depatures
 and the  
arrivals
  area
 will remain  
unchaged
. It has a  
small
  change
 that  
add
 one more checking door for each  
area
. The space for security, passport control and customs will not have any adjustments. The shop will  
be destructed
.  
The
  check
-in point and the coffee shop in the  
departures
  area
 will  
be projected
 to  
change
 to the opposite side.  
The
 bag drop will be  
added
. In the  
arrivals
  area
, there will be a massive modification. There are three buildings are in the changing plan to be  
construct
. The ATM and another coffee shop serve the customer's need, and the car hire is going to be  
subjoin
 in an expanded area.
The most noticeable  
change
 is the  
gates
.  
Now
, there are 8  
gates
 with the walkway to connect them,  
but
 after 1-year period, it  
is projected
 to become 18  
gates
, which means 10  
gates
 will be  
added
 and the way to connect them will  
also
 alter, they  
use
 sky train  
instead
 of walkway.