The map illustrates the transformation of Central School over the period of 10 years. Overall, a substantial development along with a few demolitions can be observed in the layouts of the Central school.
In 2005, the north side of the school had a parking area, a soccer field and KG section standing besides each other. To the south, the parking area was reconstructed reducing almost half of the area occupied by it previously. In addittion to that, the other half of the parking area and the earlier built soccer field was merged together to build an auditorium.
Moreover, in 2015 the KG section was shifted towards the east direction, almost reducing to one-third of the area occupied by it originally. Furthermore, the primary section was extended in to the remaining one-third portion of KG section, hence increasing the portion area occupied by it. At the same time, no changes were made to the secondary section and the assembly area of the school.
The map illustrates the transformation of Central School over the period of 10 years.
Overall
, a substantial development along with a few demolitions can
be observed
in the layouts of the Central school.
In 2005, the north side of the school had a parking
area
, a soccer field and KG
section
standing
besides
each other. To the south, the parking
area
was reconstructed
reducing almost half of the
area
occupied by it previously. In
addittion
to that, the other half of the parking
area
and the earlier built soccer field
was merged
together to build an auditorium.
Moreover
, in 2015 the KG
section
was shifted
towards the east direction, almost reducing to one-third of the
area
occupied by it
originally
.
Furthermore
, the primary
section
was extended
in to the remaining one-third portion of KG
section
,
hence
increasing the portion
area
occupied by it. At the same time, no
changes
were made
to the secondary
section
and the assembly
area
of the school.