the map college changes from now to 2020
the map college changes from now to 2020 peewL
The map illustrates the planning changes for the college between now and 2020.
It is clearly seen that in 2020, more facility will be built. Therefore the footpath and the garden will be demolished. And, Car Park capacity will be expand. In addition, the classroom will increase from 3 rooms to 5 rooms.
First of all, the garden and footpath will be removed. Therefore, it has more space to expand the car park and the building. In 2020, the car park has more 2 space than present. And, the Toilet has removed from the bottom to the opposite, which is next to the shop. Furthermore, the Library also relocated from right bottom corner into left bottom corner. In 2020, a new shop will be built, which will be located on the left top corner. Also, the reception has removed to the center of the building. However, the bus stop beside the road still remain unchanged. which besides the road.
The map illustrates the planning
changes
for the college between
now
and 2020.
It is
clearly
seen
that in 2020, more facility will
be built
.
Therefore
the footpath and the garden will
be demolished
. And, Car Park capacity will be
expand
.
In addition
, the classroom will increase from 3 rooms to 5 rooms.
First of all
, the garden and footpath will
be removed
.
Therefore
, it has more space to expand the car park and the building. In 2020, the car park has more 2 space than present. And, the Toilet has removed from the bottom to the opposite, which is
next
to the shop.
Furthermore
, the Library
also
relocated from right bottom corner into
left
bottom corner. In 2020, a new shop will
be built
, which will
be located
on the
left
top corner.
Also
, the reception has removed to the center of the building.
However
, the bus
stop
beside the road
still
remain unchanged.
which
besides
the road.