Do you want to improve your writing? Try our new evaluation service and get detailed feedback.
Check Your Text it's free

The diagram above gives us information about the manufacturing process of bricks used for the building industry.

The diagram above gives us information about the manufacturing process of bricks used for the building industry. mWLVK
From the diagram, it is noticeable that there are seven steps to manufacture bricks, started with clay-digging and ended up with the ready-to-use bricks delivery services. The process begins with collecting clay material from the source using a digger machine. Then the clay material filtered using a metal grid and crushed by the roller machine. In the next step, the crushed material mixed with sand and water so the texture changed. It can be easily shaped like a particular brick size by using a wire cutter machine or using a mould. In the fourth step, the bricks dried in the oven for 24-48 hours. Then the bricks burn on the kiln at a moderate temperature using 200C - 980C, followed by the same process with high temperature using 870-1300C, after that the bricks are left in a cooling chamber for 48-72 hours. Once the bricks have been dried and ready, it packaged with a safe wood box. As soon as it is packaged, it is distributed to the building industry and delivered by truck or pick-up car.
From the diagram, it is noticeable that there are seven steps to manufacture
bricks
,
started
with clay-digging and ended up with the ready-to-
use
bricks
delivery services.

The process
begins
with collecting clay material from the source using a digger machine. Then the clay material filtered using a metal grid and crushed by the roller machine. In the
next
step, the crushed material mixed with sand and water
so
the texture
changed
. It can be
easily
shaped like a particular
brick
size by using a wire cutter machine or using a
mould
.

In the fourth step, the
bricks
dried in the oven for 24-48 hours. Then the
bricks
burn on the kiln at a moderate temperature using 200C
-
980C, followed by the same process with high temperature using 870-1300C, after that the
bricks
are
left
in a cooling chamber for 48-72 hours. Once the
bricks
have
been dried
and ready, it packaged with a safe wood box. As
soon
as it
is packaged
, it
is distributed
to the building industry and delivered by truck or pick-up car.
What do you think?
  • This is funny writingFunny
  • I love this writingLove
  • This writing has blown my mindWow
  • It made me angryAngry
  • It made me sadSad

IELTS academic The diagram above gives us information about the manufacturing process of bricks used for the building industry.

Academic
  American English
3 paragraphs
177 words
6.0
Overall Band Score
Coherence and Cohesion: 6.5
  • Structure your answers in logical paragraphs
  • ?
    One main idea per paragraph
  • ?
    Include an introduction and conclusion
  • ?
    Support main points with an explanation and then an example
  • Use cohesive linking words accurately and appropriately
  • ?
    Vary your linking phrases using synonyms
Lexical Resource: 5.5
  • Try to vary your vocabulary using accurate synonyms
  • Use less common question specific words that accurately convey meaning
  • Check your work for spelling and word formation mistakes
Grammatical Range: 6.5
  • Use a variety of complex and simple sentences
  • Check your writing for errors
Task Achievement: 5.5
  • Answer all parts of the question
  • ?
    Present relevant ideas
  • Fully explain these ideas
  • ?
    Support ideas with relevant, specific examples
Labels Descriptions
  • ?
    Currently is not available
  • Meet the criteria
  • Doesn't meet the criteria
Recent posts