The two pictures compare the layout of a school as it was in the year 2004 with a proposed site design for the year 2024.
It is clear that the main change for 2024 involves the addition of a new school building. The school will then be able to accommodate a considerably larger number of students.
In 2004, there were 600 pupils attending the school, and the two school buildings were separated by a path running from the main entrance to the sports field. By 2024, it is expected that there will be 1000 pupils, and a third building will have been constructed. Furthermore, the plan is to join the two original buildings together, creating a shorter path that links the buildings only.
As the third building and a second car park will be built on the site of the original sports field, a new, smaller sports field will need to be laid. A new road will also be built from the main entrance to the second car park. Finally, no changes will be made to the main entrance and original car park.
The two pictures compare the layout of a
school
as it was in the year 2004 with a proposed site design for the year 2024.
It is
clear
that the
main
change
for 2024 involves the addition of a new
school
building
. The
school
will then be able to accommodate a
considerably
larger number of students.
In 2004, there were 600 pupils attending the
school
, and the two
school
buildings
were separated
by a path running from the
main
entrance to the sports field. By 2024, it is
expected
that there will be 1000 pupils, and a third
building
will have
been constructed
.
Furthermore
, the plan is to
join
the two original
buildings
together, creating a shorter path that links the
buildings
only
.
As the third
building
and a second car park will
be built
on the site of the original sports field, a new, smaller sports field will need to
be laid
. A new road will
also
be built
from the
main
entrance to the second car park.
Finally
, no
changes
will
be made
to the
main
entrance and original car park.