The data sources clearly communicate the transformation of minor theatre during the period from 2010 to 2012.
It can be visibly seen that, there was a wide-ranging in the theater with expander in size and more media services and modern facilities
In 2010, there was an auditorium, which included 16 chairs, was in front of the stage. Thus, in the top left of this theatre, there was the shortage that next to the media and the stage. Moreover, in the right of the main entrance, there existed a cafe and a ticket office in the left which aligned with the admin office.
After two years, while the auditorium remained no changes, the stage was expanded in size and the media was knocked down to construct the hall. Additionally, the shortage was moved to the top right corner and it was replaced by the media which had the showers inside. Besides, the main entrance was extended in size and the admin office was renovated to the northwest. Furthermore, the cafe was demolished and the ticket office was reconstructed to the right of the main entrance. Last but not least, the restaurant was erected on the original site of the ticket office.
The data sources
clearly
communicate the transformation of minor
theatre
during the period from 2010 to 2012.
It can be
visibly
seen
that, there was a wide-ranging in the theater with expander in size and more
media
services and modern facilities
In 2010, there was an auditorium, which included 16 chairs, was in front of the stage.
Thus
, in the top
left
of this
theatre
, there was the shortage that
next
to the
media
and the stage.
Moreover
, in the right of the main entrance, there existed a
cafe
and a ticket
office
in the
left
which aligned with the admin office.
After two years, while the auditorium remained no
changes
, the stage
was expanded
in size and the
media
was knocked
down to construct the hall.
Additionally
, the shortage was
moved
to the top right corner and it
was replaced
by the
media
which had the showers inside.
Besides
, the main entrance
was extended
in size and the admin
office
was renovated
to the northwest.
Furthermore
, the
cafe
was demolished
and the ticket
office
was reconstructed
to the right of the main entrance. Last
but
not least, the restaurant
was erected
on the original site of the ticket
office
.