The plans illustrate the layout of the theater which was shifted from 2010 to 2012
The plans illustrate the layout of the theater which was shifted from 2010 to 2012 GLlGj
The plans illustrate the layout of the theater which was shifted from 2010 to 2012
Overall, what stands out from the plans, the theater was enlarged in 2012, with many shifting positions of the layouts. Despite the increase in the size of most layouts, the auditorium still remained its size from 2010 to 2012.
Firstly, the dressing room was narrowed and moved to the left-hand side instead of the middle side in 2010. On the same floor, the spot of the dressing room was replaced by the coordination, and the storage was also superseded by the admin office in 2012. On the next floor, the appearance of the showers was one of the new layouts shifting in 2012, and the size of the stage was also strongly expanded, compared to that in 2010.
Secondly, despite the enlarging of the size of layouts in the theater, the auditorium was still sustained its size from 2010 to 2012. On the last floor of the theater, the admin office and the ticket office were integrated and replaced by the storage in 2012. Furthermore, the appearance of the restaurant and the replacement between cafe in 2010 and the ticket office in 2012 were a huge change of the layouts in the theater in 2012.
The plans illustrate the
layout
of the
theater
which
was shifted
from 2010 to 2012
Overall
, what stands out from the plans, the
theater
was enlarged
in 2012, with
many
shifting positions of the
layouts
. Despite the increase in the
size
of most
layouts
, the auditorium
still
remained its
size
from 2010 to 2012.
Firstly
, the dressing room
was narrowed
and
moved
to the
left
-hand side
instead
of the middle side in 2010. On the same floor, the spot of the dressing room
was replaced
by the coordination, and the storage was
also
superseded by the admin
office
in 2012. On the
next
floor, the appearance of the showers was one of the new
layouts
shifting in 2012, and the
size
of the stage was
also
strongly
expanded, compared to that in 2010.
Secondly
, despite the enlarging of the
size
of
layouts
in the
theater
, the auditorium was
still
sustained its
size
from 2010 to 2012. On the last floor of the
theater
, the admin
office
and the ticket
office
were integrated
and replaced by the storage in 2012.
Furthermore
, the appearance of the restaurant and the replacement between
cafe
in 2010 and the ticket
office
in 2012 were a huge
change
of the
layouts
in the
theater
in 2012.