Do you want to improve your writing? Try our new evaluation service and get detailed feedback.
Check Your Text it's free

The illustrative diagram demonstrates the process that is used to produce bricks for the building industry.

The illustrative diagram demonstrates the process that is used to produce bricks for the building industry. YkbyK
The illustrative diagram demonstrates the process that is used to produce bricks for the building industry. This process consists of 7 phases from dig clay to delivery First of all, special digger vehickle dig clay and this clay sorted by metál grid and roller. After sorted row material, add sand and water it. Then the mixture shaped as a brick by wire cutter or mould, Having formed, the row bricks sent to drying oven and they are stored for 48 hours in there. Secondly, there are 4 steps of drying bricks. Initially, raw bricks are keeped 24-48 hours in drying oven and they dried firstly 200°C-980°C and then 870°C-1300°C in kil. In the next stage, dried bricks are brought to cooling chamber to cooled bricks and brick left there for 48-72 hours. Before deliver ready bricks, they are packaged. Overall, it is clear that the graph, there are 3 main steps for manufacture bricks. They are: prepare row mixture, dry shaped row bricks and deliever they to building areas.
The illustrative diagram demonstrates the process
that is
used
to produce
bricks
for the building industry. This process consists of 7 phases from dig clay to delivery

First of all
, special digger
vehickle
dig clay and this clay sorted by
metál
grid and roller. After sorted
row
material,
add
sand and water it. Then the mixture shaped as a
brick
by wire cutter or
mould
, Having formed, the
row
bricks
sent
to drying
oven and
they
are stored
for 48 hours in there.

Secondly
, there are 4 steps of drying
bricks
.
Initially
, raw
bricks
are
keeped
24-48 hours in drying
oven and
they dried
firstly
200°C
-
980°C
and then
870°C
-
1300°C
in
kil
. In the
next
stage, dried
bricks
are brought
to cooling chamber to cooled
bricks
and
brick
left
there for 48-72 hours.
Before
deliver ready
bricks
, they
are packaged
.

Overall
, it is
clear
that the graph, there are 3 main steps for manufacture
bricks
. They are: prepare
row
mixture, dry shaped
row
bricks
and
deliever
they to building areas.
What do you think?
  • This is funny writingFunny
  • I love this writingLove
  • This writing has blown my mindWow
  • It made me angryAngry
  • It made me sadSad

IELTS essay The illustrative diagram demonstrates the process that is used to produce bricks for the building industry.

Essay
  American English
3 paragraphs
169 words
This writing has been penalized,
text can't be
less than 250 words in Task 2
and less than 150 words in Task 1
5.0
Overall Band Score
Coherence and Cohesion: 5.0
  • Structure your answers in logical paragraphs
  • ?
    One main idea per paragraph
  • Include an introduction and conclusion
  • Support main points with an explanation and then an example
  • Use cohesive linking words accurately and appropriately
  • Vary your linking phrases using synonyms
Lexical Resource: 5.0
  • Try to vary your vocabulary using accurate synonyms
  • Use less common question specific words that accurately convey meaning
  • Check your work for spelling and word formation mistakes
Grammatical Range: 5.5
  • Use a variety of complex and simple sentences
  • Check your writing for errors
Task Achievement: 5.0
  • Answer all parts of the question
  • ?
    Present relevant ideas
  • Fully explain these ideas
  • Support ideas with relevant, specific examples
Labels Descriptions
  • ?
    Currently is not available
  • Meet the criteria
  • Doesn't meet the criteria
Recent posts