The plan illustrates the current layout of an airport and proposals for its redevelopment next year. Overall, the airport is expected to become much bigger with new recreational facilities planned such as bag drop, ATM and etc.
At present, in the east of the airport, there is a solitary gate for arrivals and toward the rear of the gate, there are passport control customs. Although, in the west of the airport there is one gate for departures and places for café and check-in services. The behind of the check-in place there is security passport control. Furthermore, 8 gates are prepared for passengers.
Regarding the future plan, passenger’s entry and exit gates will be doubled and there are plans for new facilities like ATM, car hire services are going to be located in the east side of the airport. Although, café services will be developed at either side of the airport. The bag drop service will be located in the west of the airport. also, some shops are expected to be built Between gates and security passport control. In addition, the number of gates will be increased from 8 to 18 and a sky train is set to be replaced the walkway to transit passengers between the airport's gate and airplanes.
The plan illustrates the
current
layout of an
airport
and proposals for its redevelopment
next
year.
Overall
, the
airport
is
expected
to become much bigger with new recreational facilities planned such as bag drop, ATM
and etc
.
At present, in the east of the
airport
, there is a solitary
gate
for arrivals and toward the rear of the
gate
, there are passport control customs. Although, in the west of the
airport
there is one
gate
for departures and places for café and
check
-in
services
. The behind of the
check
-in place there is security passport control.
Furthermore
, 8
gates
are prepared
for passengers.
Regarding the future plan, passenger’s entry and exit
gates
will
be doubled
and there are plans for new facilities like ATM, car hire
services
are going to
be located
in the east side of the
airport
. Although, café
services
will
be developed
at either side of the
airport
. The bag drop
service
will
be located
in the west of the
airport
.
also
,
some
shops are
expected
to
be built
Between
gates
and security passport control.
In addition
, the number of
gates
will
be increased
from 8 to 18 and a sky train
is set
to
be replaced
the walkway to transit passengers between the airport's
gate
and airplanes.