The information given here showing the production of electricity from hydroelectric power station. The overall process talks about from the beginning of the river to the national grid power lines.
The entire system are divided into two important parts. The first one is operated at the daylight and the other one is at the night. The whole production starts from the high-level reservior and ends at the low-level reservior.
At the sunlight, the dam is open to make sure the water flow as the flows produce electricity. The water goes into the power station and finally the lower reservior ensure the smooth electricity for us.
The working process at night works in a reverse way. Here resersible turbines pumps the liquid in the negative way. It directly goes to the upper reservior. Since the water flow is not needed here, the dam has been closed for the night activities.
The information
given
here showing the production of electricity from hydroelectric power station. The
overall
process talks about from the beginning of the river to the national grid power lines.
The
entire system
are divided
into two
important
parts.
The
first
one
is operated
at the daylight and the other one is at the night.
The
whole production
starts
from the high-level
reservior
and ends at the low-level
reservior
.
At the sunlight, the dam is open to
make
sure the water flow as the flows produce electricity. The water goes into the power station and
finally
the lower
reservior
ensure the smooth electricity for us.
The working process at night works
in a reverse way
. Here
resersible
turbines pumps the liquid in the
negative
way. It
directly
goes to the upper
reservior
. Since the water flow is not needed here, the dam has
been closed
for the night activities.