Do you want to improve your writing? Try our new evaluation service and get detailed feedback.
Check Your Text it's free

The process to manufacture electricity in a hydroelectric power station is demonstrated by the diagram.

The process to manufacture electricity in a hydroelectric power station is demonstrated by the diagram. EdX1x
The process to manufacture electricity in a hydroelectric power station is demonstrated by the diagram. Overall, this process entails three stages, commencing with opening the intake for water to go down and terminating with pumping water back to high-level reservoir. During the day, water from the river flows in the high-level reservoirs. After that, the intake will be opened for the water to flow down the power station. In the next step, water runs across and make the reversible turbine spin. Power will be generated and transmitted to the power line then to the national grid via generator in this stage. Water after finishing its tasks will flow in the low-level reservoir. At night, water in the low-level reservoir will be pumped back into the high-level reservoirs by the reversible turbine, however, water will stop at the water pipe because the intake is closed. Until the morning, as the intake is opened, water will come into the high-level reservoir.
The process to manufacture electricity in a hydroelectric
power
station
is demonstrated
by the diagram.

Overall
, this process entails three stages, commencing with opening the
intake
for
water
to go down and terminating with pumping
water
back to
high-level
reservoir.

During the day,
water
from the river flows in the
high-level
reservoirs
. After that, the
intake
will
be opened
for the
water
to flow down the
power
station. In the
next
step,
water
runs across and
make
the


reversible
turbine spin.
Power
will
be generated
and transmitted to the
power
line then to the national grid via generator in this stage.
Water
after finishing its tasks will flow in the low-level reservoir.

At night,
water
in the low-level
reservoir
will
be pumped
back into the
high-level
reservoirs
by the reversible turbine,
however
,
water
will
stop
at the
water
pipe
because
the
intake
is closed
. Until the morning, as the
intake
is opened
,
water
will
come
into the
high-level
reservoir
.
What do you think?
  • This is funny writingFunny
  • I love this writingLove
  • This writing has blown my mindWow
  • It made me angryAngry
  • It made me sadSad

IELTS academic The process to manufacture electricity in a hydroelectric power station is demonstrated by the diagram.

Academic
  American English
5 paragraphs
159 words
6.0
Overall Band Score
Coherence and Cohesion: 5.5
  • Structure your answers in logical paragraphs
  • ?
    One main idea per paragraph
  • ?
    Include an introduction and conclusion
  • ?
    Support main points with an explanation and then an example
  • Use cohesive linking words accurately and appropriately
  • ?
    Vary your linking phrases using synonyms
Lexical Resource: 6.0
  • Try to vary your vocabulary using accurate synonyms
  • Use less common question specific words that accurately convey meaning
  • Check your work for spelling and word formation mistakes
Grammatical Range: 6.5
  • Use a variety of complex and simple sentences
  • Check your writing for errors
Task Achievement: 5.5
  • Answer all parts of the question
  • ?
    Present relevant ideas
  • Fully explain these ideas
  • ?
    Support ideas with relevant, specific examples
Labels Descriptions
  • ?
    Currently is not available
  • Meet the criteria
  • Doesn't meet the criteria
Recent posts





Get more results for topic: