The plan illustrates, the layout of theatre in 2010 and 2012
Overall, it can be seen with respect to 2010 the theatre was enlarged, and certain facilities were replaced, added and extended in 2012
Firstly, in 2010 cafe' was in the right hand side of the main door. In 2012 it was changed into ticket office. However, ticket office of 2010 and front of the main door is developed into restaurant in 2012.
On the other hand, theatre was expanded toward the left side in 2012. The Admin Office is now moves to then storage area, whereas storage is provided in the bottom corner of the expanded region in 2012. Moreover, dressing room which was at the backstage in 2010 was moved to upper corner of the expanded region in 2012. The area used for dressing then is now used for coordinating the stage show. Stage was also enlarged in 2012 when compared to 2010. Additionally, shower place is added at the left side of the stage in front of dressing room.
The plan illustrates, the layout of
theatre
in 2010 and 2012
Overall
, it can be
seen
with respect to 2010 the
theatre
was enlarged
, and certain facilities
were replaced
,
added
and extended in 2012
Firstly
, in 2010
cafe
' was in the
right hand
side of the main door. In
2012 it
was
changed
into ticket office.
However
, ticket office of 2010 and front of the main door
is developed
into restaurant in 2012.
On the other hand
,
theatre
was expanded
toward the
left
side in 2012. The Admin Office is
now
moves
to then storage area, whereas storage
is provided
in the bottom corner of the expanded region in 2012.
Moreover
, dressing room which was at the backstage in 2010 was
moved
to upper corner of the expanded region in 2012. The area
used
for dressing then is
now
used
for coordinating the stage
show
. Stage was
also
enlarged in 2012 when compared to 2010.
Additionally
, shower place is
added
at the
left
side of the stage in front of dressing room.