TASK 1
The map illustrates various kinds of changes being made from the year 2010 till the present date to the university campus.
Overall, the shops and restaurants have been relocated in one single building whereas, the area for lawn and seating has been eradicated. There has been an addition to the student accommodation facilities as compared to the campus structure in 2010. The lake has been the only place which has not gone through any renovation.
The teaching block has been bifurcated into two separate building, namely the first building being only for arts and the latter one of science. The shops and restaurants have been removed and they have been relocated in the student facilities building in the south west region. The place for lawn and seating cannot be visible in the current map structure of the campus.
There was only a single building back in 2010 for accommodation, but now there have been two addition buildings constructed, one just besides the old one and the second one in the east side of the campus. A new path has also been built for the student facilities.
TASK 1
The map illustrates various kinds of
changes
being made
from the year 2010 till the present date to the university campus.
Overall
, the shops and restaurants have
been relocated
in one single
building
whereas, the area for lawn and seating has
been eradicated
. There has been an addition to the student accommodation facilities as compared to the campus structure in 2010. The lake has been the
only
place which has not gone through any renovation.
The teaching block has
been bifurcated
into two separate
building
,
namely
the
first
building
being
only
for arts and the latter one of science. The shops and restaurants have been
removed and
they have
been relocated
in the student facilities
building
in the
south west
region. The place for lawn and seating cannot be visible in the
current
map structure of the campus.
There was
only
a single
building
back in 2010 for accommodation,
but
now
there have been two addition
buildings
constructed, one
just
besides
the
old
one and the second one in the east side of the campus. A new path has
also
been built
for the student facilities.