The maps exhibit Southwest Airport in the present time and proposed changes next year after advancement.
Overall, The principal change will be on the north side and entrance. There will be drastic changes in the airport such as new gates, cafe, ATM and car hire and some new facilities will also offer for both departing and arriving passengers.
As it is seen that, the Southwest Airport is currently divided into three segments: departures, arrivals, and the north side. The left part of the airport comprises security, passport control, a cafe and a check-in counter. The right part consists of passport control and customs. In terms of the north side, there is a walkway connected with eight gates.
After development, the pier will undergo a remarkable change in design terms, bearing a Y-shaped architecture, resulting in its area being expanded significantly. The number of boarding gates will increase accordingly, from 8 to 18 gates. They will remove the walkway and replace it with a sky train. When it comes to the left side, the cafe will be relocated to the left corner of the entrance and the check-in zone will be turned into a bag drop zone next to the previous café. There will be an expansion in the area of the arrival hall, with a car hire zone being established on this new ground. On the same side of the car hire zone, a cafe and an ATM zone will be added. There will be two departures and two arrivals gates doors in the airport. Security, passport control, and customs will be unchanged
The maps exhibit Southwest
Airport
in the present time and proposed
changes
next
year after advancement.
Overall
, The principal
change
will be on the north side and entrance. There will be drastic
changes
in the
airport
such as new
gates
,
cafe
, ATM and car hire and
some
new facilities will
also
offer for both departing and arriving passengers.
As it is
seen
that, the Southwest
Airport
is
currently
divided into three segments: departures, arrivals, and the north side. The
left
part of the
airport
comprises security, passport control, a
cafe
and a
check
-in counter. The right part consists of passport control and customs. In terms of the north side, there is a walkway connected with eight gates.
After development, the pier will undergo a remarkable
change
in design terms, bearing a Y-shaped architecture, resulting in its area
being expanded
significantly
. The number of boarding
gates
will increase
accordingly
, from 8 to 18
gates
. They will remove the walkway and replace it with a sky train. When it
comes
to the
left
side, the
cafe
will
be relocated
to the
left
corner of the entrance and the
check
-in
zone
will
be turned
into a bag drop
zone
next
to the previous café. There will be an expansion in the area of the arrival hall, with a car hire
zone
being established
on this new ground. On the same side of the car hire
zone
, a
cafe
and an ATM
zone
will be
added
. There will be two departures and two arrivals
gates
doors in the
airport
. Security, passport control, and customs will
be unchanged