Do you want to improve your writing? Try our new evaluation service and get detailed feedback.
Check Your Text it's free

The graph below show a conference hall built in 1981 and planned for 2025

The graph below show a conference hall built in 1981 and planned for 2025 KGDm0
The pictorial representation demonstrates the outline structure of Dahl conference hall in 1985 and the proposed changes for the future. In 1985, in the northern side of wall, there was a room, hall, car park. Along, gardens was located in the East side. on the W side, there was another room. Reception was situated at the middle of the hall and the whole Southern half was another garden. Several changes planned for 2025. To begin with, in the North side, in the place of car park, a new block for 20 rooms will be constructed. Moreover, in Eastern side, gardens was demolished and converted into car parking. Six room will be added in the South side of hall. The six new include an IT course, canteen and kitchen, meeting rooms and lastly game room. Overall, the major transformation will be seen in the Southern part of the hall. The development of hall opened up for people such as IT course, canteen and kitchen, meeting rooms and games room.
The pictorial representation demonstrates the outline structure of
Dahl
conference
hall
in 1985 and the proposed
changes
for the future. In 1985, in the northern side of wall, there was a
room
,
hall
, car park. Along, gardens
was located
in the East side.
on
the W side, there was another
room
. Reception
was situated
at the middle of the
hall
and the whole Southern half was another garden. Several
changes
planned for 2025. To
begin
with, in the North side, in the place of car park, a new block for 20
rooms
will
be constructed
.
Moreover
, in Eastern side, gardens
was demolished
and converted into car parking. Six
room
will be
added
in the South side of
hall
. The six new include an IT course, canteen and kitchen, meeting
rooms
and
lastly
game
room
.
Overall
, the major transformation will be
seen
in the Southern part of the
hall
. The development of
hall
opened up for
people
such as IT course, canteen and kitchen, meeting
rooms
and games
room
.
What do you think?
  • This is funny writingFunny
  • I love this writingLove
  • This writing has blown my mindWow
  • It made me angryAngry
  • It made me sadSad

IELTS academic The graph below show a conference hall built in 1981 and planned for 2025

Academic
  American English
1 paragraphs
168 words
6.0
Overall Band Score
Coherence and Cohesion: 5.5
  • Structure your answers in logical paragraphs
  • ?
    One main idea per paragraph
  • ?
    Include an introduction and conclusion
  • ?
    Support main points with an explanation and then an example
  • Use cohesive linking words accurately and appropriately
  • ?
    Vary your linking phrases using synonyms
Lexical Resource: 5.5
  • Try to vary your vocabulary using accurate synonyms
  • Use less common question specific words that accurately convey meaning
  • Check your work for spelling and word formation mistakes
Grammatical Range: 6.5
  • Use a variety of complex and simple sentences
  • Check your writing for errors
Task Achievement: 5.5
  • Answer all parts of the question
  • ?
    Present relevant ideas
  • Fully explain these ideas
  • ?
    Support ideas with relevant, specific examples
Labels Descriptions
  • ?
    Currently is not available
  • Meet the criteria
  • Doesn't meet the criteria
Recent posts





Get more results for topic: