The given layouts depict the current and proposed plans of an office building. It is manifest from the graph that radical changes have been planned for the future office building.
Presently, there are two grass areas located on the west and east of the building, with a washroom and a reception towards the lower left part of the eastern grassland. Four offices are there on the south between the western grass area and the reception. Opposite these offices towards the north, a kitchen, a canteen and a stock room can be seen. Enormous changes have been planned for the future office building. The western grassland will be converted into an outdoor activity area, whereas the eastern one will be modified into a coffee counter at the north and a meeting area in the south. The reception and the entrance are also intended to be relocated to the mid of the two office rooms on the south. The kitchen and the canteen on the north are planned to be replaced by two office rooms. The stock room will retain its place.
Overall, it is clear that the office building is planned to be totally renovated in the future.
The
given
layouts depict the
current
and proposed plans of an
office
building
. It is manifest from the graph that radical
changes
have been
planned
for the future
office
building.
Presently
, there are two grass
areas
located on the west and east of the
building
, with a washroom and a reception towards the lower
left
part of the eastern grassland. Four
offices
are there on the south between the western grass
area
and the reception. Opposite these
offices
towards the north, a kitchen, a canteen and a stock
room
can be
seen
. Enormous
changes
have been
planned
for the future
office
building
. The western grassland will
be converted
into an outdoor activity
area
, whereas the eastern one will
be modified
into a coffee counter at the north and a meeting
area
in the south. The reception and the entrance are
also
intended to
be relocated
to the mid of the two
office
rooms
on the south.
The
kitchen and the canteen on the north are
planned
to
be replaced
by two
office
rooms
.
The
stock
room
will retain its place.
Overall
, it is
clear
that the
office
building
is
planned
to be
totally
renovated in the future.