The diagram illustrates the process that is used to manufacture bricks for the building industry. Summarize the information by selecting and reporting the main features and make comparisons where relevant.

The diagram illustrates the process that is used to manufacture bricks for the building industry. E2DD
The given diagram shows the different stages of brick manufacturing for the building industries. The process of making brick involves 7 steps, starting from digging and ending with delivery where it is needed. As is given in the graph, the first step of brick manufacturing is digging the clay with a large digger. Then the clay is filtered in metal grid before the processed in a roller machine and mixed with sand and water. In the next stage, ready-made mixture is cut in wire cutter or kept in the mould to make shapes. After that, the raw bricks are dried in drying over about 24 or 48 hours. The step after this, dried bricks are kept in kiln which is the first is moderate temperature from 200C to 900C and high temperature and then placed in cooling chamber about 48 and 72 hours. After a long time, the ready bricks are packaged and finally, delivered to the companies or building places.
The
given
diagram
shows
the
different
stages of
brick
manufacturing for the building industries. The process of making
brick
involves 7 steps, starting from digging and ending with delivery where it
is needed
.

As is
given
in the graph, the
first
step of
brick
manufacturing is digging the clay with a large digger. Then the clay
is filtered
in metal grid
before
the processed in a roller machine and mixed with sand and water. In the
next
stage, ready-made mixture is
cut
in wire cutter or
kept
in the
mould
to
make
shapes. After that, the raw
bricks
are dried
in drying over about 24 or 48 hours. The step after this, dried
bricks
are
kept
in kiln which is the
first
is moderate temperature from 200C to 900C and high temperature and then placed in cooling chamber about 48 and 72 hours. After a long time, the ready
bricks
are packaged
and
finally
, delivered to the
companies
or building places.
What do you think?
  • This is funny writingFunny
  • I love this writingLove
  • This writing has blown my mindWow
  • It made me angryAngry
  • It made me sadSad

IELTS academic The diagram illustrates the process that is used to manufacture bricks for the building industry.

Academic
  American English
2 paragraphs
161 words
6.0
Overall Band Score
Coherence and Cohesion: 5.5
  • Structure your answers in logical paragraphs
  • ?
    One main idea per paragraph
  • ?
    Include an introduction and conclusion
  • ?
    Support main points with an explanation and then an example
  • Use cohesive linking words accurately and appropriately
  • ?
    Vary your linking phrases using synonyms
Lexical Resource: 6.0
  • Try to vary your vocabulary using accurate synonyms
  • Use less common question specific words that accurately convey meaning
  • Check your work for spelling and word formation mistakes
Grammatical Range: 6.5
  • Use a variety of complex and simple sentences
  • Check your writing for errors
Task Achievement: 6.5
  • Answer all parts of the question
  • ?
    Present relevant ideas
  • Fully explain these ideas
  • ?
    Support ideas with relevant, specific examples
Labels Descriptions
  • ?
    Currently is not available
  • Meet the criteria
  • Doesn't meet the criteria
Recent posts