The diagram summarizes a remodeling plan for the Southwest Airport. The development includes the building of several new areas, as well as the change in location of some of the existing areas.
Firstly, the new airport will have ten more gates than the previous one. Also, its connectivity with the city will be enhanced, as restoration plans include the installation of a new sky train and a car rental office. Because of the addition of a shopping area, new cafes and ATMs, the facilities will be improved as well. Finally, both the departure and the arrival areas will have two entrances instead of one.
The location of most of the existing facilities will be changed during the redevelopment. For instance, the café is being moved from the departures’ north-east area to the departures’ south-west corner near the entrance. Similarly, the check-in counters will be moved and replaced with a bag-drop station.
The diagram summarizes a remodeling plan for the Southwest Airport. The development includes the building of several
new
areas
,
as well
as the
change
in location of
some of the
existing areas.
Firstly
, the
new
airport will have ten more gates than the previous one.
Also
, its connectivity with the city will
be enhanced
, as restoration plans include the installation of a
new
sky train and a car rental office.
Because
of the addition of a shopping
area
,
new
cafes
and ATMs, the facilities will be
improved
as well
.
Finally
, both the departure and the arrival
areas
will have two entrances
instead
of one.
The location of most of the existing facilities will be
changed
during the redevelopment.
For instance
, the café is being
moved
from the departures’ north-east
area
to the departures’ south-west corner near the entrance.
Similarly
, the
check
-in counters will be
moved
and replaced with a bag-drop station.