The plans demonstrate how an airport called Southwest Airport will look like after the renovations in the following year.
Today, there are two main rooms including arrivals on the right and departures on the left. Inside the departure room there is a check-in on the left hand corner and a café on the right hand side. The next room is for passport control and security and the same order applies to other passengers who arrive. Behind these rooms there are foyers and next comes the walkway to the gates numbered 1-8.
Regarding the changes following redevelopment, the number of gates to both the departures and arrivals is expected to double. As for the departure hall, the check-in is expected to be relocated to the right hand side and a bag drop facility will take its place. A café is expected to be built on the left in the corner behind the entrance. The arrivals room will also have new facilities such as a café on the right corner and an ATM between the café and the car hire service, which is planned to be built as an extension. A shop will be built in the foyer leading passengers from the departure hall to the gates. Moreover, the walkway will be replaced by a sky train. Finally, the number of gates will be made 18.
Overall, it is clear that the airport will face redevelopments and more facilities will be provided for arriving and departing passengers.
The plans demonstrate how an airport called Southwest Airport will look like after the renovations in the following year.
Today
, there are two main
rooms
including arrivals on the
right
and
departures
on the
left
. Inside the
departure
room
there is a
check
-in on the
left hand
corner and a café on the
right hand
side. The
next
room
is for passport control and security and the same order
applies to
other passengers who arrive. Behind these
rooms
there are foyers and
next
comes
the walkway to the
gates
numbered 1-8.
Regarding the
changes
following redevelopment, the number of
gates
to both the
departures
and arrivals is
expected
to double. As for the
departure
hall, the
check
-in is
expected
to
be relocated
to the
right hand
side and a bag drop facility will take its place. A café is
expected
to
be built
on the
left
in the corner behind the entrance. The arrivals
room
will
also
have new facilities such as a café on the
right
corner and an ATM between the café and the car hire service, which
is planned
to
be built
as an extension. A shop will
be built
in the foyer leading passengers from the
departure
hall to the
gates
.
Moreover
, the walkway will
be replaced
by a sky train.
Finally
, the number of
gates
will
be made
18.
Overall
, it is
clear
that the airport will face redevelopments and more facilities will
be provided
for arriving and departing passengers.