These two Maps illustrate changes occured to a final path leads to a city hospital in diffent two years.
Overrely, the new differences happened in order to fix many issues for clients and Staffs in case of being crowded. Newer constructions and changing some necessary spaces’ location are seen for this reason.
These two pictures show some changes happened between 2007 and 2010. There are two round about, one located on the crossroad and the second is placed at the end the hospital wrote by removing some of hospital’s area. Bus stations has been demolished and located on the two sides of the Hospital road. The joint public and staff parking is now exclusively for stuffs and the public parking is constructed it on the right side of the hospital with a new entrane. 
These two Maps illustrate  
changes
  occured
 to a final path leads to a city  
hospital
 in  
diffent
 two years. 
Overrely
, the new differences happened in order to  
fix
  many
 issues for clients and Staffs in case of  
being crowded
. Newer constructions and changing  
some
 necessary spaces’ location are  
seen
  for this reason
.
These two pictures  
show
  some
  changes
 happened between 2007 and 2010. There are two round about, one located on the crossroad and the second  
is placed
 at the  
end
 the  
hospital
 wrote by removing  
some
 of  
hospital’s
 area. Bus stations has  
been demolished
 and located on the two sides of the  
Hospital
 road. The joint public and staff parking is  
now
 exclusively for stuffs and the public parking  
is constructed
 it on the right side of the  
hospital
 with a new  
entrane
.