The diagram reveals the proses how are produced bricks for building industry. There are a few steps, from digging with special techniques to delivering ready production.
The first step is that digger takes clay and put into special metal gird. After that clay jump down to soothing place which is roller surface and is moving next standing via this roller face. And at this point, add some sand and water in order to mix well. After being mixed, it is moved to a special box via special crack and go out another crack Presley condition. Subsequently, wire cutter chops were the Presley clay option size and appear air-brick.
In order to dry, air-brick move to drying oven and there stay 24-48 hours. After that, start 1 moment of drying moderate temperatures, which are 200°c---980°c. Following this 2 point, consider high temperatures from 870°C to1300°C. And then they cool nextduring 48 - 72 hours at cooling chamber. Finally, this brick packaging to special van and they are delivered to be needed building areas
The diagram reveals the
proses how
are produced
bricks for building industry. There are a few steps, from digging with
special
techniques to delivering ready production.
The
first
step is that digger takes clay and put into
special
metal gird. After that clay jump down to soothing place which is roller surface and is moving
next
standing via this roller face. And at this point,
add
some
sand and water in order to mix well. After
being mixed
, it is
moved
to a
special
box via
special
crack and go out another crack Presley condition.
Subsequently
, wire cutter chops were the Presley clay option size and appear air-brick.
In order to dry, air-brick
move
to drying oven and there stay 24-48 hours. After that,
start
1 moment of drying moderate temperatures, which are 200°c---980°c. Following this 2 point, consider high temperatures from
870°C
to
1300°C
. And then they cool
nextduring
48 - 72
hours at cooling chamber.
Finally
, this brick packaging to
special
van and
they
are delivered
to
be needed
building areas