The given maps depict the site of an airport now and how it will look after redevelopment in the next year.
Overall, tremendous change took places during the given time period. Few buildings will newly built in future.
It can be clearly seen that in departure area, there is a check-in in the left side. In the east side, there is a cafe. In the front of departure area, here it is security passport control and in the arrivals area, there is only a passport control customs. At the end of airport, there are 8 gates and between the building here it's a walking way.
Moving for the rest of the details, security passport and passport control customs will remained stable. In departures area, check-in will be moved to opposite side. Bag drop will be newly built in the west side. The cafe will be shifted and near the entrance. Shops will be introduced between the security passport control and gates. In the arrival area, cafe, ATM and car hire will be constructed in the east side. Gated area will be doubled by 10. In the place of walkway will be replaced by sky train and both sides of entrance will be doubled.
The
given
maps depict the site of an airport
now
and how it will look after redevelopment in the
next
year.
Overall
, tremendous
change
took places during the
given
time period. Few buildings will
newly
built
in future
.
It can be
clearly
seen
that in departure
area
, there is a
check
-in in the
left
side. In the east side, there is a
cafe
. In the front of departure
area
, here it is security
passport
control
and in the
arrivals
area
, there is
only
a
passport
control
customs. At the
end
of airport, there are 8 gates and between the building here it's a walking way.
Moving for the rest of the
details
, security
passport
and
passport
control
customs will remained stable. In departures
area
,
check
-in will be
moved
to opposite side. Bag drop will be
newly
built in the west side. The
cafe
will
be shifted
and near the entrance. Shops will
be introduced
between the security
passport
control
and gates. In the arrival
area
,
cafe
, ATM and car hire will
be constructed
in the east side. Gated
area
will
be doubled
by 10. In the place of walkway will
be replaced
by sky train and both
sides
of entrance will
be doubled
.