The map on the left depicts the site of an airport now, while the plan on the right describes its site after redesign and reconstruction next year.
Overall, it is clear that the airport's area will be expanded with more entrances, and more facilities will be provided.
There will be a significant difference for the area before the customs. The upper part will be redeveloped into a V shape with gates increased from 8 to 18, and the walkway will be replaced by a sky train. Moreover, a shop will appear in the position of the train's destination towards the customs.
For the area behind customs, more facilities will be placed. More entrances will be made both in the departure and arrival sections. The cafe and the check-in will still be kept but with its position changed inside the departure section. A bag drop place will be installed in that section. For the arrival section, a cafe and ATM will be added. Also, a space expanded in the right bottom will be provided for the new car hire service.
The map on the
left
depicts the site of an airport
now
, while the plan on the right
describes
its site after redesign and reconstruction
next
year.
Overall
, it is
clear
that the airport's area will
be expanded
with more entrances, and more facilities will
be provided
.
There will be a significant difference for the area
before
the customs. The upper part will
be redeveloped
into a V shape with gates increased from 8 to 18, and the walkway will
be replaced
by a sky train.
Moreover
, a shop will appear in the position of the train's destination towards the customs.
For the area behind customs, more facilities will
be placed
. More entrances will
be made
both in the departure and arrival
sections
. The
cafe
and the
check
-in will
still
be
kept
but
with its position
changed
inside the departure
section
. A bag drop place will
be installed
in that
section
. For the arrival
section
, a
cafe
and ATM will be
added
.
Also
, a space expanded in the right bottom will
be provided
for the new car hire service.