The diagrams demonstrate the school site in the year 2004 and which changes are planned to the site of a school for the year 2024.
Overall, the main difference is the number of school buildings which is planned to increase from 2 to three over the 20 years. In addition, an increase in the number of students from 600 to 1000 is forecasted. While the green area is planned to protect almost such as the same situation in 2004, a new car park is planned to construct on the east of new school building.
In 2004, while there were two school buildings that are separated, it is designed a bridge that connects the buildings in the year 2024. The new school building is planned to build in the former sports field which is planned to transform to the south of its location.
The access from the main entrance to the path is canceled for the plans of 2024, and the new road is designed to connect the new school building to the main entrance. Moreover, it is planned to build a new car park near school building 3 in 2024.
The diagrams demonstrate the
school
site in the
year
2004 and which
changes
are
planned
to the site of a
school
for the
year
2024.
Overall
, the main difference is the number of
school
buildings
which is
planned
to increase from 2 to three over the 20 years.
In addition
, an increase in the number of students from 600 to 1000
is forecasted
. While the green area is
planned
to protect almost such as the same situation in 2004, a
new
car park is
planned
to construct on the east of
new
school
building.
In 2004, while there were two
school
buildings
that
are separated
, it
is designed
a bridge that connects the
buildings
in the
year
2024. The
new
school
building
is
planned
to build in the former sports field which is
planned
to transform to the south of its location.
The access from the main entrance to the path
is canceled
for the plans of 2024, and the
new
road
is designed
to connect the
new
school
building
to the main entrance.
Moreover
, it is
planned
to build a
new
car park near
school
building
3 in 2024.