The given maps illustrate the current structure of a college and also give the proposed changes for 2025.
Overall, it can be seen that numerous modifications are planned for the future. The principal change will be the removal of a footpath and northern garden, while an entrance will be shifted to the south.
At present, the entry gate of the college is in the north with a garden in front. Moreover, there is a footpath which connects the southern bus stop to the northern entrance. Beside this pedestrian, there is a car park is located along the west side. furthermore looking at the internal infrastructure, there are three classrooms, a reception, a library and the toilets with a big lunch area near to the entry gate.
In 2025, the entrance will be relocated to the south, while a footpath and a northern garden will be removed to expand a car parking area and to open a shop. Apart from this, toilets will be shifted to the north between a shop and a classroom. Moreover, the the numbers of classes will be increased from 3 to 5 and reception area will be relocated as a circular shape in front of the entry gate, while the library will be shifted to the southern east from the southern west. 
The  
given
 maps illustrate the  
current
 structure of a college and  
also
 give the proposed  
changes
 for 2025. 
Overall
, it can be  
seen
 that numerous modifications  
are planned
 for the future. The principal  
change
 will be the removal of a footpath and northern garden, while an entrance will  
be shifted
 to the south.
At present, the entry gate of the college is in the north with a garden in front.  
Moreover
, there is a footpath which connects the southern bus  
stop
 to the northern entrance. Beside this pedestrian, there is a car park  
is located
 along the west side.  
furthermore
 looking at the internal infrastructure, there are three classrooms, a reception, a library and the toilets with a  
big
 lunch area near to the entry gate.
In 2025, the entrance will  
be relocated
 to the south, while a footpath and a northern garden will  
be removed
 to expand a car parking area and to open a shop. Apart from this, toilets will  
be shifted
 to the north between a shop and a classroom.  
Moreover
,  
the the
 numbers of classes will  
be increased
 from 3 to 5 and reception area will  
be relocated
 as a circular shape in front of the entry gate, while the library will  
be shifted
 to the southern east from the southern west.