The diagram below shows the process by which bricks are manufactured for the building industry.

The diagram below shows the process by which bricks are manufactured for the building industry. ggad
This figure illustrates the way in which bricks are manufactured for construction industry. Overall, there are seven stages in the process of making bricks and beginning with clay and culminating in delivery. Besides there are two ways of shaping it into rectangular form. The process of making bricks takes a lot of time in desiccation and cooling. In order to make bricks, clay has to be dug by excavator then it is ground into smaller pieces and mixed with sand and water. Once we get that compound, next stage is to form a shape of brick. This can be either done by wire cutting machine or moulding. When the bricks are shaped, they have to be dried for 24 - 48 hrs in a kiln which is heated at modest temperature, 200 - 980 degree celsius, then at high temperature, 870 - 1300 degree celsius. Thereafter, the hardened bricks need to be cooled down for 2 - 3 days at cooling chamber. After 72 hrs of cooling process is done, the package of bricks can be distributed to construction sites.
This figure illustrates the way in which
bricks
are manufactured
for construction industry.

Overall
, there are seven stages in the process of making
bricks
and beginning with clay and culminating in delivery.
Besides
there are two ways of shaping it into rectangular form. The process of making
bricks
takes
a lot of
time in desiccation and cooling.

In order to
make
bricks
, clay
has to
be dug
by excavator then it
is ground
into smaller pieces and mixed with sand and water. Once we
get
that compound,
next
stage is to form a shape of
brick
. This can be either done by wire cutting machine or
moulding
.

When the
bricks
are shaped
, they
have to
be dried
for
24 - 48
hrs in a kiln which
is heated
at modest temperature,
200 - 980
degree
celsius
, then at high temperature,
870 - 1300
degree
celsius
. Thereafter, the hardened
bricks
need to
be cooled
down for
2 - 3
days at cooling chamber. After 72 hrs of cooling process
is done
, the package of
bricks
can
be distributed
to construction sites.
What do you think?
  • This is funny writingFunny
  • I love this writingLove
  • This writing has blown my mindWow
  • It made me angryAngry
  • It made me sadSad

IELTS academic The diagram below shows the process by which bricks are manufactured for the building industry.

Academic
  American English
4 paragraphs
180 words
5.5
Overall Band Score
Coherence and Cohesion: 7.0
  • Structure your answers in logical paragraphs
  • ?
    One main idea per paragraph
  • ?
    Include an introduction and conclusion
  • ?
    Support main points with an explanation and then an example
  • Use cohesive linking words accurately and appropriately
  • ?
    Vary your linking phrases using synonyms
Lexical Resource: 5.0
  • Try to vary your vocabulary using accurate synonyms
  • Use less common question specific words that accurately convey meaning
  • Check your work for spelling and word formation mistakes
Grammatical Range: 5.5
  • Use a variety of complex and simple sentences
  • Check your writing for errors
Task Achievement: 5.0
  • Answer all parts of the question
  • ?
    Present relevant ideas
  • Fully explain these ideas
  • ?
    Support ideas with relevant, specific examples
Labels Descriptions
  • ?
    Currently is not available
  • Meet the criteria
  • Doesn't meet the criteria
Recent posts