The pictures below illustrate the various changes that will take place within college layout at the present to 2025 in the future.
Overall, the most striking changes over the school campus is demolition of huge garden on the north side. Moreover, the car park will be expanded in 2025 with more space for a numerous cars.
Obviously, the wider campus space is came from the surrounded footpath at both top and left side. In the future, the college entrance would be moved in the opposite side, which is located in front of the road. The replacement of main gate lead to the change of toilets to the north of the campus. The small older library is moved to larger location in the right of the entrance. The middle room reception is convert to the 2 small classrooms in the right and be moved near to the yard on the entrance path. The lunch area still be remain in the same place; however, there is a new shop is constructed on the top right corner of the campus. 
The pictures below illustrate the various  
changes
 that will take place within college layout at the present to 2025 in the future. 
Overall
, the most striking  
changes
 over the school  
campus
 is demolition of huge garden on the north side.  
Moreover
, the car park will  
be expanded
 in 2025 with more space for a numerous  
cars
. 
Obviously
, the wider  
campus
 space is  
came
 from the surrounded footpath at both top and  
left
 side. In the future, the college entrance would be  
moved
 in the opposite side, which  
is located
 in front of the road. The replacement of main gate lead to the  
change
 of toilets to the north of the  
campus
. The  
small
 older library is  
moved
 to larger location in the right of the entrance.  
The
 middle room reception is convert to the 2  
small
 classrooms in the right and be  
moved
 near to the yard on the entrance path.  
The
 lunch area  
still
 be  
remain
 in the same place;  
however
, there is a new shop  
is constructed
  on the top right corner
 of the  
campus
.