The brick manufacturing process

The brick manufacturing process BJJEm
The diagram show the stages by which bricks is been manufactured. Overall, it can be seen that, there are total of 7 stages to get brick ready for use. Although the 1st two does not follow the process. To begin, a heavy duty machine ( digger) will dig out clay from the soil, clay put on roller to grid the metal, this, reduce clay into smaller pieces then, water is added to form brick, from this point, brick can be cut by wire cutter or mould depending on the choice of the company before sending to dry oven for the next 24- 48 hours. Furthermore, after drying, it been transfered to kiln for moderate heat which takes about 200 degrees to 980 degrees then moves to high heat of 870 degrees to 1300 degrees. Finally, brick is sent to cooling chamber lasting 48 to 72 hours then, packaging follows and last stage the delivery van carries it out of factory.
The diagram
show
the stages by which
bricks
is
been manufactured.

Overall
, it can be
seen
that, there are
total
of 7 stages to
get
brick
ready for
use
.
Although
the 1st two does not follow the process.

To
begin
, a
heavy duty
machine
(
digger) will dig out clay from the soil, clay put on roller to grid the metal, this,
reduce
clay into smaller pieces then, water is
added
to form
brick
, from this point,
brick
can be
cut
by wire cutter or
mould
depending on the choice of the
company
before
sending to dry oven for the
next
24- 48
hours.

Furthermore
, after drying, it
been
transfered
to kiln for moderate heat which takes about 200
degrees
to 980
degrees
then
moves
to high heat of 870
degrees
to 1300
degrees
.
Finally
,
brick
is
sent
to cooling chamber lasting 48 to 72 hours then, packaging follows and last stage the delivery van carries it out of factory.
What do you think?
  • This is funny writingFunny
  • I love this writingLove
  • This writing has blown my mindWow
  • It made me angryAngry
  • It made me sadSad

IELTS academic The brick manufacturing process

Academic
  American English
4 paragraphs
160 words
6.0
Overall Band Score
Coherence and Cohesion: 7.0
  • Structure your answers in logical paragraphs
  • ?
    One main idea per paragraph
  • ?
    Include an introduction and conclusion
  • ?
    Support main points with an explanation and then an example
  • Use cohesive linking words accurately and appropriately
  • ?
    Vary your linking phrases using synonyms
Lexical Resource: 5.0
  • Try to vary your vocabulary using accurate synonyms
  • Use less common question specific words that accurately convey meaning
  • Check your work for spelling and word formation mistakes
Grammatical Range: 6.5
  • Use a variety of complex and simple sentences
  • Check your writing for errors
Task Achievement: 5.0
  • Answer all parts of the question
  • ?
    Present relevant ideas
  • Fully explain these ideas
  • ?
    Support ideas with relevant, specific examples
Labels Descriptions
  • ?
    Currently is not available
  • Meet the criteria
  • Doesn't meet the criteria
Recent posts