Do you want to improve your writing? Try our new evaluation service and get detailed feedback.
Check Your Text it's free

South west airport renovation plans

South west airport renovation plans KW9Aw
This map allows us to see the renovation plans of the Southwest airport for the next year. Looking from an overall perspective, multiple customer centered facilities like ATM, cafeteria, etc will be set down in various areas of the airport including an increase in the number of arrival and departure gates. As of now, it has eight entry points along with a walkway which leads to the passport control customs on the contrary none from the security control. Future plans consist of installing ten more entry/exit points to the airport in two separate wings to aid the easy passage of passengers arriving as well as departing. Additionally, the passageway will be replaced with a sky train for easy access to both arrival and departure. Focusing on the customer centered facilities, the departure wing consists of a single cafe and a check-in counter. This wing will be further developed into providing an extra counter for baggage drop with tiny relocations of the cafeteria and the check-in counter. As for the arrival wing, installation of another cafeteria, an ATM as well as a car hire has been planned.
This map
allows
us to
see
the renovation plans of the Southwest airport for the
next
year. Looking from an
overall
perspective, multiple customer centered facilities like ATM, cafeteria, etc will
be set
down in various areas of the airport including an increase in the number of arrival and departure gates.

As of
now
, it has eight entry points along with a walkway which leads to the passport control customs
on the contrary
none from the security control. Future plans consist of installing ten more entry/exit points to the airport in two separate wings to aid the easy passage of passengers arriving
as well
as departing.
Additionally
, the passageway will
be replaced
with a sky train for easy access to both arrival and departure.

Focusing on the customer centered facilities, the departure wing consists of a single
cafe
and a
check
-in counter. This wing will be
further
developed into providing an extra counter for baggage drop with tiny relocations of the cafeteria and the
check
-in counter. As for the arrival wing, installation of another cafeteria, an ATM
as well
as a car hire has
been planned
.
What do you think?
  • This is funny writingFunny
  • I love this writingLove
  • This writing has blown my mindWow
  • It made me angryAngry
  • It made me sadSad

IELTS academic South west airport renovation plans

Academic
  American English
3 paragraphs
186 words
6.5
Overall Band Score
Coherence and Cohesion: 7.0
  • Structure your answers in logical paragraphs
  • ?
    One main idea per paragraph
  • ?
    Include an introduction and conclusion
  • ?
    Support main points with an explanation and then an example
  • Use cohesive linking words accurately and appropriately
  • ?
    Vary your linking phrases using synonyms
Lexical Resource: 6.0
  • Try to vary your vocabulary using accurate synonyms
  • Use less common question specific words that accurately convey meaning
  • Check your work for spelling and word formation mistakes
Grammatical Range: 6.5
  • Use a variety of complex and simple sentences
  • Check your writing for errors
Task Achievement: 6.5
  • Answer all parts of the question
  • ?
    Present relevant ideas
  • Fully explain these ideas
  • ?
    Support ideas with relevant, specific examples
Labels Descriptions
  • ?
    Currently is not available
  • Meet the criteria
  • Doesn't meet the criteria
Recent posts





Get more results for topic: