Given are the maps providing us with information regarding the renovation of an airport now and then in the succeeding year.
Overall, it is starkly apparent that many new facilities would be constructed during the rebuilding, while some parts of the old airport would stay pristine.
When scrutinizing more rigorously, it can be inferred that at the arrivals part, an ATM machine and a café would be added. Moreover, a new car hire sector would be springing up in the vicinity of the second entrance on the right side. Meanwhile, in the center of the departure, the café would be conveyed from northeast to the southeast of the center. Another transferring would have occurred for check-in which would move from left to the opposite side. A new bag drop also would be developed there. Security passport control in both departures and arrivals buildings would stay untouched.
Turning to the space above the eastern security passport control, a new retail market would be built there. The number of gates, additionally, would increase from 8 to 18 and the area would become more spacious. The access of the passengers to the gates would alter too. Not only would it be changed into a sky train instead of a walkway but also, it would move to the center of the area.
Given
are
the maps providing us with information regarding the renovation of an airport
now
and then in the succeeding year.
Overall
, it is
starkly
apparent that
many
new
facilities would
be constructed
during the rebuilding, while
some
parts of the
old
airport would stay pristine.
When scrutinizing more
rigorously
, it can
be inferred
that at the arrivals part, an
ATM machine
and a café would be
added
.
Moreover
, a
new
car hire sector would be springing up in the vicinity of the second entrance on the right side. Meanwhile, in the center of the departure, the café would
be conveyed
from northeast to the southeast of the center. Another transferring would have occurred for
check
-in which would
move
from
left
to the opposite side. A
new
bag drop
also
would
be developed
there. Security passport control in both departures and arrivals buildings would stay untouched.
Turning to the space above the eastern security passport control, a
new
retail market would
be built
there. The number of gates,
additionally
, would increase from 8 to 18 and the area would become more spacious. The access of the passengers to the gates would alter too. Not
only
would it be
changed
into a sky train
instead
of a walkway
but
also
, it would
move
to the center of the area.