The maps display the current layout of the center of a small town, Islip, and how it is planned to develop it.
Overall, the town center is to be brought up-to-date, with the construction of some modern facilities and more housing.
There is a main road running east-west through the town center. This road has two side roads, one leading to the school southwest of the town center and the other to the park in the southeast. While the main road is to be pedestrianized, the two side roads are to be turned into a dual carriageway, extending to the countryside north of the town center.
All the shops north of the main road are to be demolished to make room for a shopping center, which is to have a car park and bus station nearby. There are also plans to build some new housing northeast of the main road.
To the south of the main road are some shops and housing. The shops are to remain unchanged, whereas the housing is to be relocated. Lastly, some parts of the park are going to be cleared so that new residential buildings can be built, and an extension is planned for the school.
The maps display the
current
layout of the center of a
small
town
,
Islip
, and how it
is planned
to develop it.
Overall
, the
town
center is to
be brought
up-to-date, with the construction of
some
modern facilities and more housing.
There is a
main
road
running east-west through the
town
center. This
road
has two side
roads
, one leading to the school southwest of the
town
center and the other to the park in the southeast. While the
main
road
is to
be pedestrianized
, the two side
roads
are to
be turned
into a dual carriageway, extending to the countryside north of the
town
center.
All the shops north of the
main
road
are to
be demolished
to
make
room for a shopping center, which is to have a car park and bus station nearby. There are
also
plans to build
some
new housing northeast of the
main
road.
To the south of the
main
road
are
some
shops and housing. The shops are to remain unchanged, whereas the housing is to
be relocated
.
Lastly
,
some
parts of the park are going to
be cleared
so
that new residential buildings can
be built
, and an extension
is planned
for the school.