The two plans illustrate the present and the projected changes of an airport site plan.
At first sight, it can clearly be seen that the total area of the renovation plan on the right is approximately twice as much the existing plan, as a new set of gates has been added to it.
Also, the arrangement of the gates on the northernmost side is significantly different, comparing to the old scheme.
These alterations include the development of eight existing gates, circling around a rectangle shape to ten further gates surrounding a y-shaped wing.
At a second glance on both plan, the number of entrances and exits on the southern side has also doubled, however, their locations are supposed to remain unchanged. Additionally, the position of indoor areas such as the check-In and the cafe are going to be relocated to the westside of the departion lobby; Furthermore, a new range of subsidiary functions consisting a second cafe, an ATM and a station for rental cars are going to be added to the arrival section. Finally, the walk away route between the gates is going to be replaced by a sky train line which seems to help making a much easier transportation system in the renovated building.
The two
plans
illustrate the present and the projected
changes
of an airport site plan.
At
first
sight, it can
clearly
be
seen
that the total area of the renovation
plan
on the right is approximately twice as much the existing
plan
, as a new set of
gates
has been
added
to it.
Also
, the arrangement of the
gates
on the northernmost side is
significantly
different
, comparing to the
old
scheme.
These alterations include the development of eight existing
gates
, circling around a rectangle shape to ten
further
gates
surrounding a y-shaped wing.
At a second glance on both
plan
, the number of entrances and exits on the southern side has
also
doubled,
however
, their locations
are supposed
to remain unchanged.
Additionally
, the position of indoor areas such as the
check
-In and the
cafe
are going to
be relocated
to
the westside of
the
departion
lobby;
Furthermore
, a new range of subsidiary functions consisting a second
cafe
, an ATM and a station for rental cars are going to be
added
to the arrival section.
Finally
, the walk away route between the
gates
is going to
be replaced
by a sky train line which seems to
help
making
a much easier transportation system in the renovated building.