The diagram illustrates how the development of Chorleywood village in London took place between 1868 and 1994, over a period of 125years.
As the picture suggests, there is less development during 18th century when the village witnessed some development works. The railways were introduced in 1909 and it went across station area and surrounding by grounds. Also, grounds are wider development during 1970 and 1994. The Motorway was built in 1970 which creates an intersection point with railways. It is worth noticing that the village was witnessed a faster development during the period from 1970 to 1994. The park and golf course situated in the middle of the village and Chorleywood station near to the junction of main road and railway lines.
Overall, it can be seen that the development works in the village were done in the different periods and much of these constructions were done between 1970 and 1994.
The diagram illustrates how the
development
of
Chorleywood
village
in London took place between 1868 and 1994, over a period of 125years.
As the picture suggests, there is less
development
during 18th century when the
village
witnessed
some
development
works. The railways
were introduced
in 1909 and it went across station area and surrounding by grounds.
Also
, grounds are wider
development
during 1970 and 1994. The Motorway
was built
in 1970 which creates an intersection point with railways. It is worth noticing that the
village
was witnessed
a faster
development
during the period from 1970 to 1994. The park and golf course situated in the middle of the
village
and
Chorleywood
station near to the junction of main road and railway lines.
Overall
, it can be
seen
that the
development
works in the
village
were done
in the
different
periods and much of these constructions
were done
between 1970 and 1994.