The two pictures compare the layout of the school as it was year 2004 and with a proposed site layout for the year 2024.
It is clear that the main change for 2024 involves the addition of a new school building. In 2004, there were 600 pupils attending the school and to be able to accommodate 1000 pupils in 2024.
In 2004, the two school buildings were separated by a path running from the main entrance to sports field. Furthermore, the plan is to join the two original buildings together creating a shorter path that link the buildings only. Besides, the sports field is going to be demolished and the third new school building with second car park will be built on 2024. After that the new small sports field will be built on behind of third new school building. The new road will also be built from the main entrance to the second car park.
Finally, no change will be made to the main entrance and original car park.
The two pictures compare the layout of the
school
as it was year 2004 and with a proposed site layout for the year 2024.
It is
clear
that the
main
change
for 2024 involves the addition of a
new
school
building
. In 2004, there were 600 pupils attending the
school
and to be able to accommodate 1000 pupils in 2024.
In 2004, the two
school
buildings
were separated
by a path running from the
main
entrance to sports field.
Furthermore
, the plan is to
join
the two original
buildings
together creating a shorter path that link the
buildings
only
.
Besides
, the sports field is going to
be demolished
and the third
new
school
building
with second car park will
be built
on 2024.
After
that the
new
small
sports field will
be built
on behind of third
new
school
building
. The
new
road will
also
be built
from the
main
entrance to the second car park.
Finally
, no
change
will
be made
to the
main
entrance and original car park.