The map details plans for the renovation in the next year of Southwest Airport. Looking from an overall perspective, it is readily apparent that the number of gates will greatly expand and there will be a variety of customer-facing facilities added including shops, a car hire, and an ATM.
The location of the departure and arrival entrances will remain the same but there are plans to install additional doors. Upon entering the airport, there is currently a single check-in and cafe. The future plan projects moving the check-in from the left to right side of the departure space in order to make room for a bag drop area and the repositioning of the cafe. The arrival section will affix a cafe, ATM and car hire that necessitates expanding the size of the building. Security, passport control, and customs will be unchanged, however, the future floor plan shows shops immediately upon exiting the security section for departures. The largest proposed alterations are replacing a walkway with a long sky train track and constructing 2 branching corridors that will enable flyers to reach more than twice as many gates (8 at the moment and 18 after renovations).
The map
details
plans
for the renovation in the
next
year of Southwest Airport. Looking from an
overall
perspective, it is
readily
apparent that the number of gates will
greatly
expand and there will be a variety of customer-facing facilities
added
including shops, a car hire, and an ATM.
The location of the departure and arrival entrances will remain the same
but
there are
plans
to install additional doors. Upon entering the airport, there is
currently
a single
check
-in and
cafe
. The future
plan
projects moving the
check
-in from the
left
to right side of the departure space in order to
make
room for a bag drop area and the repositioning of the
cafe
. The arrival section will affix a
cafe
, ATM and car hire that necessitates expanding the size of the building. Security, passport control, and customs will
be unchanged
,
however
, the future floor
plan
shows
shops immediately upon exiting the security section for departures. The largest proposed alterations are replacing a walkway with a long sky train
track
and constructing 2 branching corridors that will enable flyers to reach more than twice as
many
gates (8 at the moment and 18 after renovations).