The presented map demonstrates next year the development plan of an airport. Overall, there are four main development consisting of bag drop, ATM, sky train, and care hire.
It is apparently seen that two additional entrances will be demolished at departures and arrivals entrances. The southeast side of the airport will be expanded, and it will be the location of car hire center. Check-in station will be relocated to the northeast of the departures gate. Cafe will be substituted by bag drop station, and it will be moved to southwest of the departures gate. ATM will be sprang up at the south of the cafe.
Walk way will be destroyed, and sky train will be replaced. Shops will be constructed at north side of security passport control. The airport will be expanded, and constructed the right and left wings of the gates. Eight more gates will be constructed, and located arroung the location of the sky train.
The presented map demonstrates
next
year the development plan of an airport.
Overall
, there are four main development consisting of bag drop, ATM, sky train, and care hire.
It is
apparently
seen
that two additional entrances will
be demolished
at departures and arrivals entrances. The southeast side of the airport will
be expanded
, and it will be the location of car hire center.
Check
-in station will
be relocated
to the northeast of the departures
gate
.
Cafe
will
be substituted
by bag drop station, and it will be
moved
to southwest of the departures
gate
. ATM will be
sprang
up at the south of the
cafe
.
Walk way will be
destroyed
, and sky train will
be replaced
. Shops will
be constructed
at north side of security passport control. The airport will
be expanded
, and constructed the right and
left
wings of the
gates
. Eight more
gates
will
be constructed
, and located
arroung
the location of the sky train.