The picture provides us information about the improvement of SouthWest airport in the following year
The picture provides us information about the improvement of SouthWest airport in the following year O6bxE
The picture provides us information about the improvement of SouthWest airport in the following year.
In general, it can be seen that there will be considerable changes in the airport such as: new gates, cafe, ATM, car hire and some new facilities will also offer for both departing and arriving passengers.
In more detail, we can see in recent year the airport just has a humble structure that is divided into three segments: departures, arrivals, and the north side. At the entrance for marching passengers, there have a check-in area on the left side and a small café shop on the top right corner near by the security passport control. Additionally, passport control customs has some space. Eight gates are associated with a walkway on the north side of the airport.
After renovating, ten more gates will be built to the northeast and northwest, and all gates will be connected with a sky train rather than a walkway. The café will be enthused to the left bottom, and the check-in counter will be substituted by a bag drop room and relocated to the last safe place. A new café and an ATM are predicted to build in the east of the airport. Some space on the right side of the airport will be extended that will be used for car hire. There will be two departures and two arrivals gates doors in the airport. Security, passport control, and customs will be unaffected. Furthermore, the future floor plans shows there also will have a shop above the security passport control.
The picture provides us information about the improvement of
SouthWest
airport
in the following year.
In general
, it can be
seen
that there will be considerable
changes
in the
airport
such as: new
gates
,
cafe
, ATM, car hire and
some
new facilities will
also
offer for both departing and arriving passengers.
In more detail, we can
see
in recent year the
airport
just
has a humble structure that
is divided
into three segments: departures, arrivals, and the north side. At the entrance for marching passengers, there have a
check
-in area on the
left
side and a
small
café shop
on the top right corner
near by
the security
passport
control
.
Additionally
,
passport
control
customs has
some
space. Eight
gates
are associated
with a walkway on the north side of the airport.
After renovating, ten more
gates
will
be built
to the northeast and northwest, and all
gates
will
be connected
with a sky train
rather
than a walkway. The café will
be enthused
to the
left
bottom, and the
check
-in counter will
be substituted
by a bag drop room and relocated to the last safe place. A new café and an ATM
are predicted
to build in the east of the
airport
.
Some
space on the right side of the
airport
will
be extended
that will be
used
for car hire. There will be two departures and two arrivals
gates
doors in the
airport
. Security,
passport
control
, and customs will
be unaffected
.
Furthermore
, the future floor plans
shows
there
also
will have a shop above the security
passport
control
.