The photo below illustrates the structure of an airport now and the changes of it after rebuilding next year. Overall, it will be expanded with more gates. We will have the addition of other new facilities in the airport to make pasengers fell more comfort.
Recently, the airport is divided into three segments: departures, arrivals and the north side. There is security, passport control, a cafe shop and a check-in counter in the left. About the right part, there is also passport control and customs. The airport has eight gates- connected with a walkway at the north side.
By the following year, this building will be installed ten more gates at the northeast and northwesft side. All gates will be connected with a sky train so that passengers can have more convenience. The cafe is going to be moved to the left bottom. Next, the check- in will be also replaced by a bag drop room and relocated at old position of cafe shop. A new cafe and an ATM will be build at the east of the airport on the right side. Moreover, people will enlagre the space on the right side for car hire. Two departures and two arrivals gate doors would be installed. Besides, security, passport control and customs will be remained unchanged.
The photo below illustrates the structure of an
airport
now
and the
changes
of it after rebuilding
next
year.
Overall
, it will
be expanded
with more
gates
. We will have the addition of other new facilities in the
airport
to
make
pasengers
fell more comfort.
Recently, the
airport
is divided
into three segments: departures, arrivals and the north side. There is security, passport control, a
cafe
shop and a
check
-in counter in the
left
. About the right part, there is
also
passport control and customs. The
airport
has eight
gates-
connected with a walkway at the north side.
By the following year, this building will
be installed
ten more
gates
at the northeast and
northwesft
side. All
gates
will
be connected
with a sky train
so
that passengers can have more convenience. The
cafe
is going to be
moved
to the
left
bottom.
Next
, the
check
- in will be
also
replaced by a bag drop room and relocated at
old
position of
cafe
shop. A new
cafe
and an ATM will be build at the east of the
airport
on the right side.
Moreover
,
people
will
enlagre
the space on the right side for car hire. Two departures and two arrivals
gate
doors would
be installed
.
Besides
, security, passport control and customs will
be remained
unchanged.