Do you want to improve your writing? Try our new evaluation service and get detailed feedback.
Check Your Text it's free

The maps illustrate the plan to redevelop the Southwest airport in the following year.

The maps illustrate the plan to redevelop the Southwest airport in the following year. PLrG2
The maps illustrate the plan to redevelop the Southwest airport in the following year. Overall, although this development will retain the 3-block-complex design of the airport consisting of departure/arrival halls, security area, and the pier, there will be some significant changes to the pier as well as the construction of new architectural features. Looking at the maps, the pier will undergo a notable change, which will be expanded towards both the top-right and top-left corners for the addition of ten more gates. Furthermore, the walkway will be cleared to make way for the sky train a year later. Moving to the departure/arrival area, the bag drop zone will replace the check-in zone, which will be moved to the opposite side. Also, the café will be relocated to the left corner of the entrance. Moreover, there will be an expansion in the area of the arrival hall, and the car hire area will be established in the new ground. Additionally, a café and an ATM zone will be added on the same side of the car hire zone. Finally, there is no remarkable change in the security area, except for the appearance of shops near the security passport control.
The maps illustrate the plan to redevelop the Southwest airport in the following year.

Overall
, although this development will retain the 3-block-complex design of the airport consisting of departure/arrival halls, security
area
, and the pier, there will be
some
significant
changes
to the pier
as well
as the construction of new architectural features.

Looking at the maps, the pier will undergo a notable
change
, which will
be expanded
towards both the top-right and top-
left
corners for the addition of ten more gates.
Furthermore
, the walkway will
be cleared
to
make
way for the sky train a year later.

Moving to the departure/arrival
area
, the bag drop
zone
will replace the
check
-in
zone
, which will be
moved
to the opposite side.
Also
, the café will
be relocated
to the
left
corner of the entrance.
Moreover
, there will be an expansion in the
area
of the arrival hall, and the car hire
area
will
be established
in the new ground.
Additionally
, a café and an ATM
zone
will be
added
on the same side of the car hire
zone
.
Finally
, there is no remarkable
change
in the security
area
,
except for
the appearance of shops near the security passport control.
What do you think?
  • This is funny writingFunny
  • I love this writingLove
  • This writing has blown my mindWow
  • It made me angryAngry
  • It made me sadSad

IELTS academic The maps illustrate the plan to redevelop the Southwest airport in the following year.

Academic
  American English
4 paragraphs
198 words
6.5
Overall Band Score
Coherence and Cohesion: 7.0
  • Structure your answers in logical paragraphs
  • ?
    One main idea per paragraph
  • ?
    Include an introduction and conclusion
  • ?
    Support main points with an explanation and then an example
  • Use cohesive linking words accurately and appropriately
  • ?
    Vary your linking phrases using synonyms
Lexical Resource: 5.5
  • Try to vary your vocabulary using accurate synonyms
  • Use less common question specific words that accurately convey meaning
  • Check your work for spelling and word formation mistakes
Grammatical Range: 6.5
  • Use a variety of complex and simple sentences
  • Check your writing for errors
Task Achievement: 7.0
  • Answer all parts of the question
  • ?
    Present relevant ideas
  • Fully explain these ideas
  • ?
    Support ideas with relevant, specific examples
Labels Descriptions
  • ?
    Currently is not available
  • Meet the criteria
  • Doesn't meet the criteria
Recent posts