The given maps illustrate the information about the current structure of area at the seaside resort of Templeton and the alterations that will occur in future.
Overall, it can be seen clearly that the given sea side of the resort is predicted to be changed in the directions accept Northwest and it will come more developed.
Going into the details, currently, there is a river in the centre which flow from a sea on the south side to the North side. In the West direction of river, there are a number of individual houses present. In the addition to it, there are also some tall buildings. In the east side, school and hospital is situated with the housing facilities and trees. In the opposite side of it, most of area is covered with trees and some houses. In the same side, there is a railway station.
Moving further, in future, in west side of the river, houses are expected to be change into the apartments. Moreover, it is projected that most of trees will cut down in order to construct a supermarket and houses. According to the prediction, school and hospital will remain at same place but some new facilites will be added sach as airport and houses. In the opposite direction, construction of factory is projected. Railway track also estimated to be extended.
The
given
maps illustrate the information about the
current
structure of area at the seaside resort of Templeton and the alterations that will occur
in future
.
Overall
, it can be
seen
clearly
that the
given
sea side of the resort
is predicted
to be
changed
in the directions accept Northwest and it will
come
more developed.
Going into the
details
,
currently
, there is a river in the
centre
which flow from a sea on the south side to the North side. In the West direction of river, there are a number of individual
houses
present. In the addition to it, there are
also
some
tall buildings.
In
the east side, school and hospital
is situated
with the housing facilities and trees.
In
the opposite side of it,
most of area
is covered
with trees and
some
houses
.
In
the same side, there is a railway station.
Moving
further
,
in future
, in west side of the river,
houses
are
expected
to be
change
into the apartments.
Moreover
, it
is projected
that
most of trees
will
cut
down in order to construct a supermarket and
houses
. According to the prediction, school and hospital will remain at same place
but
some
new
facilites
will be
added
sach as
airport and
houses
. In the opposite direction, construction of factory
is projected
. Railway
track
also
estimated to
be extended
.