According to the diagram, in 2008, the main entrance was opened to the waiting room that led towards to the north side. In the waiting room, staff office and reception were there. To the right side of the waiting room, laboratory was opened which also had access from the waiting room. On the northwest side, treatment room was opened. From the right side of the treatment room, there were three doctor's office which also opened the door to the corridor.
In 2010, looking towards to the southwest ward an education room and mother and child room were constructed. Pharmacy was designed on the southeast side behind the laboratory which also opened the door to corridor. Interestingly, doctor's office turned into small and converted to four instead of three office. Store room was added to the northeast side just after doctor's room.
Overall, it is manifest from the diagram that, there were lots of changes were made in just two years.
According to the diagram, in 2008, the main entrance
was opened
to the
waiting
room
that led towards to the north side. In the
waiting
room
, staff
office
and reception were there. To the right side of the
waiting
room
, laboratory
was opened
which
also
had access from the
waiting
room
. On the northwest side, treatment
room
was opened
. From the right side of the treatment
room
, there were three
doctor's
office
which
also
opened the door to the corridor.
In 2010, looking towards to the southwest ward an education
room
and mother and child
room
were constructed
. Pharmacy
was designed
on the southeast side behind the laboratory which
also
opened the door to corridor.
Interestingly
, doctor's
office
turned into
small
and converted to four
instead
of three
office
. Store
room
was
added
to the northeast side
just
after doctor's room.
Overall
, it is manifest from the diagram that, there were lots of
changes
were made
in
just
two years.