The diagram illustrates that there are different stages for manufacturing bricks in an industry.
The diagram illustrates that there are different stages for manufacturing bricks in an industry. jdOD1
The diagram illustrates that there are different stages for manufacturing bricks in an industry. This includes eight stages in total involving clay digging, blending, moulding, heating, drying, packaging and delivery to the desired areas.
Firstly, the unprepared clay is dug out from the ground and spread over the metal grid. Afterwards, the clay is then blended with sand and water to achieve desired texture. Once the mixture has achieved, it is cut with wire cutter or processed in a mould box. Next, the moulded bricks are heated in the drying oven for 24-48 hours as the first step of drying process. Later, moderate to high temperature from 200*C- 980*C and from 870*C-1300*C are required to achieve hardness and strength of a qualified brick. Once the drying and heating are completed, they are transferred to a cooling chamber again for 48-72 hours as a final and is important stage.
Finally, the bricks are ready for packaging and delivered to the construction sites and factories.
The diagram illustrates that there are
different
stages for manufacturing
bricks
in an industry. This includes eight stages in total involving clay digging, blending,
moulding
, heating,
drying
, packaging and delivery to the desired areas.
Firstly
, the unprepared clay
is dug
out from the ground and spread over the metal grid. Afterwards, the clay is then blended with sand and water to achieve desired texture. Once the mixture has achieved, it is
cut
with wire cutter or processed in a
mould
box.
Next
, the
moulded
bricks
are heated
in the
drying
oven for 24-48 hours as the
first
step of
drying
process. Later, moderate to high temperature from
200*C
-
980*C
and from
870*C
-
1300*C
are required
to achieve hardness and strength of a qualified
brick
. Once the
drying
and heating
are completed
, they
are transferred
to a cooling chamber again for 48-72 hours as a final and is
important
stage.
Finally
, the
bricks
are ready for packaging and delivered to the construction sites and factories.