The given maps provide the information about the infrastructure of college is present days as well as the plan for upcoming time modification till 2020. In present days, road and bus stop are situated in south direction directly opposite to Garden. Furthermore, Footpath is converted the whole area by connection left side of this is car parking section and the opposite right side is lunch area and two classrooms. Meanwhile, in right side of lunch area is another classroom below of these are reception and Library. Following this, exactly bottom direction between classroom and Library is toilet. Turning towards the future physical setup of college will be road and bus stop unchanged, however, the size of parking area will modify in 2020 and garden as well as Footpath will be disappear. Then, while entrance into main section on left side of library above of this will class room lunch area and shop. Moreover, behind entrance will be circular Reception area in far distance will toilet. The east side of this will be four new classrooms. Overall, it is noticed from render diagrams those illustrates the setup of a college the in present and in 2020 year with some addition, subtraction and replacement of distinct features.
The
given
maps provide the information about the infrastructure of college is present days
as well
as the plan for upcoming time modification till 2020. In present days, road and bus
stop
are situated
in south direction
directly
opposite to Garden.
Furthermore
, Footpath
is converted
the whole
area
by connection
left
side of this is car parking section and the opposite right side is lunch
area
and two classrooms. Meanwhile, in right side of lunch
area
is another classroom below of these are reception and Library. Following this, exactly bottom direction between classroom and Library is toilet. Turning towards the future physical setup of college will be road and bus
stop
unchanged,
however
, the size of parking
area
will modify in 2020 and garden
as well
as Footpath will be
disappear
. Then, while entrance into main section on
left
side of library above of this will
class
room lunch
area
and shop.
Moreover
, behind entrance will be circular Reception
area
in far distance will toilet. The east side of this will be four new classrooms.
Overall
, it
is noticed
from render diagrams
those illustrates
the setup of a college the in present and in 2020 year with
some
addition, subtraction and replacement of distinct features.